Sudbury

Laurentian School of Architecture Phase 2

The contractor building the second phase of the Laurentian School of Architecture is dealing with a lot of water. The water table is high and must be lowered to allow the foundation to be built. Contractor Bondfield Construction is pumping out the water and sending it to the water treatment plant.