Business

Judge rejects Michigan's latest argument against Enbridge Line 5 pipeline

A Michigan judge has ruled in favour of Enbridge Inc. in its long-standing dispute with the state over the Line 5 cross-border pipeline.

Canadian company's proposed Line 5 oil tunnel faced pushback

A woman holds a protest sign that says "retire Enbridge Line 5"
Opposition to the Line 5 pipeline has been going on in the U.S. state for years, as shown in this photo from a protest in Holt, Mich., in 2017. (Cory Morse/The Grand Rapids Press/The Associated Press)

The international dispute over Line 5 belongs in federal court, a Michigan judge declared Thursday, dealing a critical blow to Gov. Gretchen Whitmer's bid to shut down the controversial cross-border oil and gas pipeline.

It's the second time in nine months that District Court Judge Janet Neff has sided with pipeline owner Enbridge Inc., which wanted the dispute elevated to the federal level.

The first decision last November prompted Michigan Attorney General Dana Nessel — believing her only path to victory to be in state court — to abandon the original case, turning instead to a separate, dormant, nearly identical circuit court case to try again.

Neff's disdain for that tactic was palpable throughout Thursday's ruling.

"The court concludes that (the) plaintiff's motion must fail, based on ...(the) plaintiff's attempt to gain an unfair advantage through the improper use of judicial machinery," Neff wrote.

"The court's decision ... is undergirded by (the) plaintiff's desire to engage in procedural fencing and forum manipulation."

The response late Thursday from Amber McCann, Nessel's director of communications, was even more fierce.

Nessel "remains steadfast in her commitment to protect Michigan's natural resources from the potentially devastating impact of environmental disaster," McCann said.

"The department strongly disagrees with the judge's mistaken characterization of both the law and the attorney general's approach to this and related cases."

The office is reviewing the decision and "considering next steps to pursue in the litigation," she added.

Great Lakes vulnerable to pipeline spill, says governor

The Straits of Mackinac divide Michigan's Upper and Lower peninsulas, and connect Lake Huron to Lake Michigan. Enbridge has proposed building an oil pipeline tunnel beneath the straits, but many in the state, including its governor, are against the project. (Carlos Osorio/The Associated Press)

Whitmer is a Democrat and close ally of President Joe Biden. She has been trying since November 2020 to shut down Line 5 for fear of a spill in the Straits of Mackinac, the environmentally sensitive passage between Michigan's Upper and Lower peninsulas, where the pipeline crosses the Great Lakes.

Enbridge pushed back hard against the original circuit court case, arguing that its core elements of energy security, cross-border commerce and international relations demanded that it be heard at the federal level — a move Nessel strenuously tried to resist.

Late last year, Neff sided with Enbridge, prompting Whitmer and Nessel to abandon the complaint and try again, this time with a similar circuit court case that had been dormant since 2019.

Nessel had hoped to head off Enbridge's jurisdictional argument on a technicality: that under federal law, cases can only be removed to federal jurisdiction within 30 days of a complaint being filed.

But Neff wasn't buying it, citing the precedent she herself established in 2021 when she ruled for Enbridge the first time.

"The 30-day rule in the removal statute is intended to assist in the equitable administration of justice and prevent gamesmanship over federal jurisdiction, but here, it is clear to the court that (the) plaintiff is the one engaging in gamesmanship."

Pipeline is vital source of energy: proponents

This October 2016 file photo shows an aboveground section of Enbridge's Line 5 at the Mackinaw City, Mich., pump station. (John Flesher/The Associated Press)

The Line 5 pipeline ferries upwards of 540,000 barrels per day of crude oil and natural gas liquids across the Canada-U. S. border and the Great Lakes by way of a twin line that runs along the lake bed.

Critics want the line shut down, arguing it's only a matter of time before an anchor strike or technical failure triggers a catastrophe in one of the area's most important watersheds.

Proponents of Line 5 call it a vital and indispensable source of energy, especially propane, for several Midwestern states, including Michigan, Ohio and Pennsylvania. It is also a key source of feedstock for refineries in Canada, including those that supply jet fuel to some of Canada's busiest airports.

In a statement, Enbridge described Thursday's decision as "consistent with the court's November 2021 ruling that the state's prior suit against Line 5 belonged in federal court."

That, the company said, is the correct forum for "important federal questions" about interstate commerce, pipeline safety, energy security and foreign relations.

The statement goes on to say that shutting down Line 5 would "defy an international treaty with Canada that has been in place since 1977."

In this May 31, 2002, file photo, the sun sets over the Mackinac Bridge, the dividing line between Lake Michigan and Lake Huron, at Michigan's Mackinac Straits. (Al Goldis/The Associated Press)

Line 5 talks between the two countries under that treaty, which deals specifically with the question of cross-border pipelines, have been ongoing since late last year.

"Enbridge looks forward to a prompt resolution of this case in federal court."

On Thursday, Enbridge Inc. closed a deal to take over operations of the Gray Oak oil pipeline in Texas, a 1,367-kilometre pipeline with a shipping capacity of 900,000 barrels per day.

With files from The Associated Press